Debunking the Myth
A steel framed solution, comprising a composite steel deck floor slab was decided on as the best solution, to incorporate natural ventilation and thermal mass to control building temperatures. Alasdair Cameron, Durham County Council Design Engineer, says:We wanted a naturally ventilated building with a design that would help cut down running costs and lower emissions. We also wanted to optimise the thermal mass by exposing the floors to allow them to absorb heat during the day and dissipate it at night.
The building achieved a BREEAM ‘Very good’ rating
More detailed information on this building can be obtained by clicking here
|
'Architect' |
Mouchel |
|
'Structural engineer' |
Capita Symonds |
|
'Main contractor' |
Gentoo |
|
'Steelwork fabricator ' |
Hambleton Steel |
|
'Client' |
Durham County Council and Seaham Town Council |