Structural Steel Design Awards 2021 - Commendation
80 Charlotte Street has a simple steel frame with lateral stability provided by concrete cores. The simplicity of the steelwork and the holistic innovative ‘lean’ floor solution provided the client with a maximum desired floor-to-ceiling height and an extra storey of accommodation. The structural floor system comprises bespoke prestressed 100mm thick precast planks, with fair faced soffits and a 50mm topping, supported on shelf plates welded to the webs of 450mm deep primary steel plate girder beams. The exposed steelwork, combined with the 9m × 6m column grid pattern and simple, clean, elegant detailing of the connections, creates a contemporary and spacious office environment.
Fire protection requirements for beams which pass through compartment walls, and for beams with top flanges at floor level, were optimised using computational heat transfer modelling and finite element analysis. This enabled board fire protection to be designed out of the scheme, saving critical programme and embodied carbon. The structure has a 90-minute fire resistance period and is provided with intumescent paint, pigmented with a dark grey, highly decorated finish to add to the industrial feel of the space. Adding to the scheme’s industrial look, all of the services, which are accommodated within bespoke cells cut into the plate girder beams, are also exposed within the completed building.
Further details of the design and construction of this project are available here.
|
Architect |
Make |
|
Structural Engineer |
Arup |
|
Steelwork Contractor |
Bourne Group Ltd |
|
Main Contractor |
Multiplex Construction Europe Ltd |
|
Client |
Derwent London |
Judges' comment
The team have achieved the surprisingly difficult task of making a complex building look simple. The attention to detail, especially in the steel connections, achieves the industrial feel that the team aimed for. Optimising beam spans reduces embodied carbon and an all-electric power system that uses renewable electricity ensures the building is net-zero carbon.