Structural Steel Design Awards 2018 - Commendation
Early in the design concept it was decided that a steel frame would provide a flexible solution that would allow the design to develop right up to the start on site. Without the steel frame the project would not have been affordable, nor would it have been as dramatic and elegant, from the sports and leisure venue right through to the indoor rooftop football pitch under a 60m by 60m clear span fabric roof.
The use of a steel frame was fundamental to:
- keep the amount of piling to a minimum thus reducing environmental impact.
- allow the M&E flexibility by creating clear soffits in the main service run directions keeping coordination simple and fabrication modifications, such as holes in beams, to a minimum.
- create a 60m by 32m clear span sports hall that can be converted into a 3000-4000 seat performance venue that has a football pitch over it. It has five different possible uses planned and is designed to be so flexible that the adjacent main accommodation at the upper levels is supported by super trusses to accommodate extra viewing and seating zones with uninterrupted views.
- design a very lightweight and very shallow two-way spanning fabric roof structure and a feature ‘Beacon’ polycarbonate façade that can come alive at night with lighting.
- create a building that fits the superb architecture, within the tight budget, to a very high aesthetic standard.
Further details of the design and construction of this project are available here.
|
'Architect' |
FaulknerBrowns |
|
'Structural Engineer' |
s h e d |
|
'Steelwork Contractor' |
Harry Marsh (Engineers) Ltd. |
|
'Main Contractor' |
Tolent Construction |
|
'Client' |
The Foundation of Light |
Judges' comment
A new landmark in regenerating Sunderland, this glowing cube of a building, a home for the Foundation of Light, is a community supported combination of school, sports halls and 3000-seater performance venue. It even includes a covered football pitch on the roof. The steel frame economically resolves structural challenges from foundations to its 60m by 60m clear span fabric roof.