Cambridge Riverside Footbridge

The geometry of the bridge is particularly complex with a double curved and cantilevered steel deck. The main span over the river is supported by an inclined steel tubular arch, which rises up between separate decks for cyclists and pedestrians.
The main bridge span was fully assembled and site welded in an area on the North Bank of the river. A 1000t capacity crawler crane was then assembled on the site and used to pick up the bridge as a complete unit and place it in position during a short river closure.